The technology for boring-reaming the bolt hole of pin connecting original main shaft with new runner of turbine in site of Danjiangkou hydropower plant and its effect are described.
介绍了丹江口电厂在机组改造增容中新转轮与原大轴连接销钉螺栓孔工地同镗铰所采用的方法及达到的效果。
Guide vane operation structure includes the guide vane arm clip board, guide vane arm, segmental keys, connection board, handle, cut pin, connecting rod pin and gland, etc.
导叶操作机构主要包括:导叶臂压板、导叶臂、分瓣键、连接板、耳柄、剪断销、连杆销及压盖等。
When the screwdriver is in place, remove the E-clip (Figure F) and pin connecting the structural members and the check clapper will open with no tension.
当螺丝刀就位后,拆卸图f中的E夹和连接结构部件的销钉,则止回阀阀瓣将在没有张力的情况下开启。
应用推荐